Shopify Reorder Point Formula: Lead Time, Safety Stock, MOQ & Case-Pack Rounding

Quick Answer: Your true reorder quantity is (Daily Sales × (Lead Time + Safety Days)) minus (On Hand + Incoming POs), rounded up to the supplier’s case-pack multiple and floored at the Minimum Order Quantity (MOQ).

The 3-step reorder equation that prevents stockouts

Most merchants only look at On Hand units, which ignores how fast an item sells and how long the factory takes to ship. Combining daily velocity with supplier lead time and safety buffer gives you an objective Target Stock number for every SKU.

Target Stock = Daily Velocity × (Lead Time Days + Safety Days)
Raw Needed = max(0, Target Stock − (On Hand + Incoming Open POs))

Worked example with MOQ and case packs

Suppose your 32oz Insulated Flask sells 4.8 units/day, has a 21-day supplier lead time, a 14-day safety buffer, 18 units on hand, 0 incoming, an MOQ of 48, and ships in cases of 12.

Target Stock = 4.8 × (21 + 14) = 168 units. Raw Needed = 168 − 18 = 150 units. Because the supplier only ships in cases of 12, rounding 150 up to the next multiple of 12 gives 156 units (13 cases)—and since 156 exceeds the 48-unit MOQ, your final PO line is 156 units.

  • If Raw Needed is 0, order 0—never let MOQ force an order when stock is already healthy.
  • If Raw Needed is 15 and MOQ is 48 (case pack 12), floor at 48 units.
  • Always subtract Sent and Partially Received POs before calculating Raw Needed.

Frequently Asked Questions

How many safety days should a Shopify store use?

Start with 14 safety days for domestic suppliers and 21–30 safety days for overseas ocean freight, then tighten buffers on slow movers to free up cash.

Why does subtracting open POs matter so much?

Without deducting Sent POs, your reorder report keeps flagging the same SKU every morning until the shipment physically arrives, which leads to accidental double orders.